Our 14 inches slurry pumps with oil lubrication are ready for ship to the world’s largest copper company, we have adapted an automatic oil filling device, it could be ensure the lubricating o...
Recently,We had done the Nondestructive inspection penetrant test(PT) for high chrome alloy casting according to customer requirements,Steps are as follows:
1. Clean the processed surface
2. Spray...
Spring is here, and the factory has a new look. Today, we complete customer orders as scheduled.
The clean and tidy factory is destined to have a bright future.
In the past few days, the world is full of epidemics, and the isolation is too depressing, so a few good news are sent. After our underwater sand dredging pump was repaired, it was hoisted from the...
Since the beginning of 2000, the whole world has been affected by the new crown virus. As a socially responsible company, our company has dedicated its efforts to the society in the process of figh...
We know that the injection mold consists of a movable mold and a fixed mold. The movable mold is installed on the moving template of the injection molding machine, and the fixed mold is installed o...